Join our family of curious Kansas Citians

Discover unheard stories about Kansas City, every Thursday.

Thank you for subscribing!

Check your inbox, you should see something from us.

Sign Me Up
Hit enter to search or ESC to close

Push On to Restore Power at EV Fast-Charging Stations HiON Taking Over Old Evergy Stations

Share this story
Above image credit: A HiON Network EV fast charger at Starbucks, 16521 W. 119th St., Olathe, Kansas. This site is available to the public and delivers a 50-kilowatt charge to all types of electric vehicles. (Contributed | HiON)
Sponsor Message Become a Flatland sponsor
4 minute read

A Brookside woman recently was shocked to learn that fast chargers for her electric vehicle have gone dead on the Missouri side of the metro. 

She raced out to Kansas City International Airport to pick up her boyfriend. Then the two of them, with their “range anxiety” mounting, watched the charge dial on the return trip dip way too low. They slinked back home at low speeds, car heat off, to save juice. 

Untold numbers of electric vehicles owners on the Missouri side of the metro have for more than a year had to do without fast chargers set up by Evergy. Most were unaware why. Evergy had pulled the plug on them as the technology became obsolete and state regulators in both Kansas and Missouri told electric utilities to get out of the vehicle charging business.

The disruption is more serious in Missouri, where state officials have put in place some of the lowest subsidies of any state for investors in charging infrastructure. 

In Kansas, subsidies are also thin but better, and the chargers west of the state line should be back any day now.

As might be expected in any grand transformation of our basic urban infrastructure, hiccups are to be expected as we navigate the migration from fossil-fuel-powered transport to sustainable electric mobility.  

For the roughly 20,000 EV owners in Kansas and Missouri, that hiccup is more pronounced because this region is much slower to embrace EV mania than the West Coast and Northeast. 

A Brief History of EV Fast Charging in KC

Evergy nine years ago deployed 15 direct current fast chargers around Kansas City to help remove or reduce the range anxiety” of its customers contemplating the purchase of an electric vehicle to help combat climate change.

The communications technology linked to the chargers became obsolete and were withdrawn from service during the first three months of 2022, according to Evergy.

Many local EV owners have not been aware of the decommissioning of the units and they have continued to wonder if they are just temporarily out-of-service.

Evergy, in response to Flatland inquiries, said it has come under pressure from Kansas and Missouri state utility regulators to get out of the EV charging business and turn it all over to private third-party operators.

One rationale is that the federal government has ramped up significant subsidies to help rapidly build out EV charging along major transportation corridors highways and within urban areas.

One local startup, HiON, has taken over the old Evergy fast chargers on the Kansas side of the metro.

Jim Frank, HiON founder and CEO, said that he is ready to crank them up but is awaiting Evergy’s completion any day nowof final metering work at all the Kansas locations except one at Town Center Plaza. Frank said he is still in talks with the property owner.

As for the Missouri side of the metro, those high-speed charging units should come back starting this summer, according to both Frank and Evergy’s Nick Voris.   

Five of six fast chargers formerly operated by Evergy on the Kansas side of the metro will be working any day now, as soon as Evergy can install metering and some finishing work, according to Jim Frank.  

Frank is the founder of a Shawnee, Kansas, startup, HiON, which will be operating them. The fate of the sixth, at Town Center Plaza in Leawood, will be hammered out in discussions with the property owner. 

Nine fast chargers on the Missouri side of the state line might be up and running again starting this summer as new subsidies, currently available in Kansas, kick in, Frank and an Evergy representative said. 

For Kansas Citians, the oddity is that their Kansas City Power & Light Co. hometown utility, now known as Evergy, went all in honeycombing the metro with EV chargers years ago.  

The company proudly announced its “build it and they shall come” approach to electric transport. The program was much more aggressive than many of its sister utilities in areas where public concern about climate change was more intense than in middle America. 

The result? The EV fast-charging equipment deployed early on locally has become obsolete, according to Nick Voris, Evergy’s senior manager of electrification products and services. 

“Most public charging stations communicate with a network that allows the stations to accept and process customer payments, remotely monitor station status, etc.,” Voris explained. “These stations communicated via the 3G cellular network, which was shut down nationally.  Given their age, the charging station manufacturer decided to forego development of a hardware upgrade option that would allow the stations to communicate via the 4G cellular network.  Consequently, the service life of these stations — which entered service in 2014 — ended with the 3G network.” 

According to one EV charging expert, utilities nationally have shied away from engaging in the charging business. Less than 2% of chargers in America are now owned by utilities, according to Loren McDonald of EVAdoption. 

Frank, in a wide-ranging interview with Flatland, said his HiON is a small company with a staff of about a dozen and big ambitions. He has worked for 35 years in electrical contracting and built and supplied technology upgrades to telecom cell towers. 

HiON has plans to develop “thousands” of EV chargers, primarily in EV-loving states such as Colorado, Massachusetts, Rhode Island and Florida. 

“We’ve been talking to Evergy for quite a while,” he said. “At multiple sites, equipment is fading. We agreed to upgrade. We are waiting for Evergy to add meters. We don’t have power turned on.” The stations in Kansas are expected to be turned on soon. But “that’s up to Evergy,” Frank said. 

The HiON chargers now being installed will deliver 50 kilowatts of energy for customers who will typically charge for between 10 minutes and one hour while they shop, eat out or see a movie. “My guess is there will be an average of $10 to $12 per charging session,” he said. 

Many high-speed chargers are deployed along interstates where they can provide EV drivers with 150 miles to 200 miles of driving range in about 30 minutes for $20 to $25, Frank said. 

An electric vehicle as it is being charged.

Former Evergy Fast-Charging Stations

  1. Hen House Market, 15000 W. 87 St. Pkwy., Lenexa, Kansas – HiON
  2. Starbucks, 16521 W. 119th St., Olathe, Kansas – HiON
  3. Town Center Plaza, 5000 W. 119th St., Leawood, Kansas – TBD
  4. Prairiefire Shopping Center, 5602 W. 136th Terr. Overland Park, Kansas – HiON
  5. Price Chopper, 7201 W. 151st St., Overland Park, Kansas – HiON
  6. Rosana Square, 7584 W. 119th St., Overland Park, Kansas – HiON
  7. Hy-Vee, 8301 N. St. Clair Ave., Kansas City, Missouri
  8. Hy-Vee,  301 N.E. Rice Road, Lee’s Summit, Missouri
  9. Hy-Vee, 5330 N.W. 64th  St., Kansas City, Missouri
  10. Hy-Vee, 201 N. Belt Hwy St., Joseph, Missouri
  11. KC Public Library, 106 W. 10 St., Kansas City, Missouri
  12. Country Club Plaza Garage, 4706 Broadway, Kansas City, Missouri
  13. Price Chopper, 9717 N. Ash Ave., Kansas City, Missouri
  14. Orscheln Farm & Home, 1107 S.W. Westminster Road, Blue Springs, Missouri
  15. Town Pavilion Parking, 1211 Walnut St., Kansas City, Missouri

The delay in reviving the Evergy fast chargers in Missouri is a result of state officials just this month issuing the incentives they will provide to private operators opening fast charge sites, he said. 

Evergy said that the Missouri subsidies will become available in April while in Kansas they were launched a year ago. 

Compared to other states, Missouri’s offering along with Kansas’ are “on the extreme low end,” Frank said. In some instances, Colorado will provide as much as $140,000 worth of subsidies per site for EV chargers, Frank said. 

“It’s problematic,” he said. But it reflects the relatively slow pace of electric vehicle sales in this part of the country. Even so, Frank said that as a native of Kansas City, he wants to make sure there are fast chargers available locally. 

Kansas offers subsidies of $20,000 per site, while Missouri offers the lower of either $20,000 or 40% of the total cost, Frank said. He declined to say what his typical cost is but indicated that other states and utilities in other regions offer much richer subsidies than are available locally. 

“We are very purposeful where we place a multi-decade asset,” he said. “We put a lot of work into it before we talk to a utility.” 

There may be a risk to those developing charging infrastructure as the technology rapidly improves. 

“My guess is that it’s going to have incremental improvement,” he said. Frank said companies like HiON will thrive as the interface improves between utilities and the electric grid on one side and electric vehicle owners on the other. 

Voris of Evergy said his company will work closely with fast charge developers to make sure that the public gets the charging services it will need. 

“They need to understand the utility upgrades that are needed,” Voris said. “We will be consulting and providing information.” 

Evergy’s culture and business model are evolving along with the growing electrification of transportation and other corners of our economy. Voris said his unit within the utility, transportation electrification, was formed three years ago and has three people reporting to him. 

A few years ago, Evergy worked with Nissan to help first-time EV buyers buy a Leaf. It also helped sponsor EV owner parties to build camaraderie among the city’s early adopters. The ranks of EV owners have grown so rapidly that those kinds of social gatherings are fast becoming a distant memory.  

“I don’t see a lot of parties in our future,” Voris said. 

Federal subsidies for EV ownership have mitigated the need for utility-run programs, Voris said. 

“We want to support our customers who are looking to electrify,” he said. “I’m not going to sell you an electric car. But when it comes (on the grid) we want it to do so in a grid friendly way. We started from the bottom with zero EVs seven years ago. We have over 16,000 now. We expect to have 130,000 by the close of the decade.” 

By any yardstick, a revolution in transport is well underway. And a charging station near you should soon reopen.  

Martin Rosenberg is a Kansas City journalist and host of the Grid Talk podcast on the future of energy.

Like what you are reading?

Discover more unheard stories about Kansas City, every Thursday.

Thank you for subscribing!

Check your inbox, you should see something from us.

Enter Email
Reading these stories is free, but telling them is not. Start your monthly gift now to support Flatland’s community-focused reporting. Support Local Journalism
Sponsor Message Become a Flatland sponsor

Ready to read next

curiousKC | Submit Questions About Disability Resources in KC 

Inform Next ‘Flatland in Focus’ Episode, Airing April 20 

Read Story

One thought on “Push On to Restore Power at EV Fast-Charging Stations

  1. Well, I was bored and had time, so I plugged into the new enel X DCFC at Lackman and 87th St. There is no signage or any info whatsoever about costs or an app or customer service.
    I tried tracking down an app and after a 15 minute call with a nice gentleman in South Africa it was decided that the enel X app was not needed. That’s the name on this station. No mention of HiON.
    I tapped my phone when I thought I had the app installed.
    Instead my CC was charged $15.
    I got 9.5 kWh from the station during my stay there. HiON does not answer their phone.
    I want an explanation of the cost.

    Frank, what’s the deal? This should be easier….

Leave a Reply